东方军事网——关注国内外军事前沿变革。军事爱好者交流社区!
东方军事网
Current Location: 东方军事 > 英文军事 >

Zhurihe Training Base sees new mode of energy supply

时间:2021-03-25 ReadingNumber:东方军事网 鼎盛军事论坛 Source:http://www.df81.cn
After three years of construction, the PLA's first national energy demonstration project was completed and put into operation at the Zhurihe Training Base recently.
 

By Yu Haiqing and Sun Xingwei

BEIJING, Mar. 22 -- After three years of construction, the PLA’s first national energy demonstration project was completed and put into operation at the Zhurihe Training Base recently. It indicates that the base has developed a new energy supply mode with wind and solar power generation as the mainstay, diesel generators as the backup, power grid transmission as the supplement, and intelligent power storage as the support.

This demonstration project not only has strong reliability and high power self-sufficiency rate, but also realizes clean energy heating, which fundamentally solves the energy supply problem of the military base and the training troops.

In winter, the Zhurihe Training Base has harsh conditions and heavy training support tasks. There is a great demand for electricity and heating for the troops in the field, especially during the peak training period when problems are highlighted due to no backup energy support and the shortage of boiler heating.

To this end, the Logistic Support Department under China’s Central Military Commission (CMC) developed the National Energy Demonstration Project in the Zhurihe Training Base, with the support from China’s National Energy Administration (NEA).

Taking into account the local resources and the actual energy demand of the base, the competent military departments have explored the construction of multi-energy complementary smart micro-grids and clean energy heating systems, aiming to build a demonstration project for the comprehensive utilization of power in large-scale military bases.

As for the power generated, priority is given to ensuring the military facility's power supply and the excessive part will be integrated into the local power grid.

It is learnt that the project adopts a joint military-civilian construction approach. The electricity cost of this project can be reduced by about 30 percent compared with the municipal power supply.

(Responsible editor:鼎盛军事论坛)

重庆古筝培训 | 境外自由行 | 高铁线路网 | 爱去世界之最

百度一下:Zhurihe Training Base sees new mode of energy supply 查找更多相关信息!


360搜索:Zhurihe Training Base sees new mode of energy supply 查找更多相关信息!


Google Search:Zhurihe Training Base sees new mode of energy supply Find more information!


------分隔线----------------------------
说点什么吧
  • 全部评论(0
    还没有评论,快来抢沙发吧!
Military recommendation